Client Overview

The client operates gas pressure reduction and metering stations within a natural gas distribution network. These stations form a critical link between high pressure national transmission pipelines and lower pressure local distribution networks.

Each Gas Pressure Reduction and Metering Station, commonly referred to as PRMS, regulates pressure, measures gas volumes for billing, filters impurities, and prepares gas for safe distribution into urban networks.

PURE EFFICIENCY | PURE SUSTAINABILITY | PURE SAVINGS

Project Background

Within every PRMS, gas pressure reduction causes a rapid temperature drop due to the Joule–Thomson effect. Without preheating, this cooling can lead to ice formation, hydrate build up, corrosion, equipment damage and inaccurate metering.

Traditionally, preheating is achieved through direct fired gas boilers. While functional, these systems consume significant volumes of natural gas and create high operating costs. Rising energy prices and increasing pressure to reduce emissions prompted the operator to review the efficiency of its heating system.

The objective was clear. Reduce auxiliary gas consumption, lower operational costs, and improve environmental performance without compromising reliability.

The Challenge

The PRMS required consistent and controlled gas preheating before pressure reduction. Any interruption to this process would risk:

  • Blocked valves and filters due to ice or hydrates
  • Equipment stress caused by low temperatures
  • Metering inaccuracies affecting billing
  • Reduced operational continuity

The operator needed a solution that could:

  • Deliver stable preheating performance
  • Reduce gas self consumption
  • Integrate with existing infrastructure
  • Provide measurable cost savings

The Solution

The operator installed a hybrid system combining existing boilers with a Robur GAHP A 35 kW gas absorption heat pump.

Unlike conventional boilers, the GAHP unit uses natural gas to transfer heat from ambient air through a water ammonia absorption cycle. This approach significantly increases gas utilisation efficiency. The system achieves a Gas Utilisation Efficiency of up to 172 percent when compared with the calorific value of the gas consumed.

The heat pump provides base load preheating, while existing boilers remain available for peak demand support.

System Configuration

The installation included:

  • Preheating via GAHP A 35 kW unit
  • Retention of existing boilers for support
  • Integration with existing heat exchangers
  • Outdoor placement in non classified areas
  • No requirement for additional flue systems

The solution required minimal electrical input, below 1 kW during operation, which avoided upgrades to the existing electrical infrastructure.

Performance Results

The performance comparison was measured over 196 operating days.

Existing Boiler System

  • Gas self consumption: 16,668 Scm
  • Total gas cost: EUR 16,668
  • Electricity consumption: 0 kWh
  • Total operating cost: EUR 16,668

Boilers + GAHP A 35 kW

  • Gas self consumption: 8,306 Scm
  • Gas cost: EUR 8,306
  • Electricity consumption: 2,800 kWh
  • Electricity cost: EUR 846
  • Total operating cost: EUR 9,152

The result was a 46 percent reduction in total operating costs.

Gas self consumption fell by approximately 50 percent. Although the system introduced a modest electrical demand, overall savings remained substantial.

Environmental Impact

The installation delivered measurable environmental improvements:

  • Reduced primary gas consumption
  • Lower CO2 emissions
  • Reduced NOx emissions
  • Use of natural refrigerant ammonia with zero global warming potential
  • No restrictions under F Gas regulations

Flow temperatures up to 65 degrees Celsius were achieved, with reliable operation even at low ambient temperatures. Defrost cycles were short and did not interrupt performance.

Wider Deployment

The technology has been implemented in more than 140 PRMS installations in Italy, operated by major gas distribution companies. The results consistently demonstrate improved energy performance, lower emissions and dependable operation.

Key Outcomes

  • 46 percent reduction in operating costs
  • 50 percent reduction in gas self consumption
  • Minimal electrical demand
  • No major infrastructure modifications
  • Improved ESG alignment
  • Rapid economic return

Conclusion

This case demonstrates how upgrading the preheating stage within a gas pressure reduction and metering station can significantly improve operational efficiency.

By integrating gas absorption heat pump technology alongside existing boilers, the operator reduced costs, improved environmental performance and strengthened long term infrastructure resilience.

For gas distribution networks seeking measurable efficiency gains without compromising reliability, gas absorption heat pumps provide a proven and scalable solution.